|
H Pile
Splicers
 |
H PILE BEAM SPLICERS
On many H pile jobs where splicers are required in steel H beams, the time required to make the splice can equal or exceed
pile driving time. MIDAMERICA
FOUNDATION CONSTRUCTION
H pile splicers substantially reduce splicing time in two ways.
First, H pile alignment is quick and easy as the splice also serves
as the welding template. The H pile splicers slip over the driven H bearing pile
section and the new section easily slides into the top of the
H pile splicer providing quick and accurate alignment. Second, welding
time is greatly reduced-often by up to 75% as only a fraction
of the weld is required. Quick
and easy to attach
Made of A-36 steel for easy welding
Tapered ends slide easily onto H pile beams
Minimum delay time for H bearing pile driving crew
Splice stronger than unspliced beam
Sizes available for all H beam sections
|
 |
STEEL SHEET
PILING PROTECTORS
MIDAMERICA
FOUNDATION CONSTRUCTION
cast steel sheeting and steel piling edge protectors help insure pile penetration
and at the same time provide significant protection for the
leading edge of H piles. Edge
fluting aids in keeping H piles vertical while driving
Wedge shape opens slots to ease driving and reduces abrasion
pile coatings
Strong cast steel shoe protects pile edge from damage (ASTM
A148 80/40)
May be installed with tack-weld or drive fit
|
 |
ONE
PIECE PROTECTOR
The Protector Shoe is available as one-piece attachment
for the popular Z sheet pile sections. It fits exactly-no cutting,
no small pieces, no delays. Just tack weld to sheet pile and
drive. |
|
MAFCO
Mid-America Foundation Supply, Inc.
PH:
888-893-7453
Fax: 260-424-8635
3101
New Haven Ave.
Fort Wayne, IN 46803
••••••••••••••

Poseidon Barge
Corp.
••••••••••••••

Enviro Media
Blasting
Low Dust Abrasive
Blasting Technology
••••••••••••••

Hercules Machinery Corp.
Manufacturer
and Supplier of Foundation Equipment. |