Procedure For Attaching
H-Beam Splicers

  1. Bevel outside edges of flange and cut notch 7/8 inch x 2-1/2 inch in web.
  2. Slide splicer onto beam until bar slides into notch.
  3. Weld sleeve with full joint penetration to the entire full cross section of the beam using 5/16 inch fillet weld.
  4. Turn beam over and weld the other side the same way.

Note: Verify with each contractor per project. Some states have different specifications for welding splicers.

MAFCO
Mid-America Foundation Supply, Inc.

PH: 888-893-7453
Fax: 260-424-8635

3101 New Haven Ave.
Fort Wayne, IN 46803

••••••••••••••


Poseidon Barge Corp.

••••••••••••••


Enviro Media Blasting

Low Dust Abrasive
Blasting Technology

••••••••••••••


Hercules Machinery Corp.

Manufacturer and Supplier of Foundation Equipment.

  Mid-America Foundation Supply (MAFCO). © 2006.